Commercial and industrial products
|
Fixed with Locational Marginal Price (LMP) + adder above block
Electric generation is purchased in a fixed block (both time and quantity) at a fixed price. The charge will be LMP + adder for any additional electricity consumed outside the block.
- Limits your exposure to price volatility
- Takes advantage of lower-cost power during off-peak periods

(05/31/07)
|
|